Dual fuel kit for diesel generator: frequently asked questions

Dual Fuel Kit and CNG / PNG Kit for Generators: Frequently Asked Questions

Common questions from DG set owners about converting diesel generators to run on natural gas (PNG or CNG) with a dual fuel kit.

Frequently asked questions

Can a diesel generator run on CNG or PNG?

Yes. With a dual fuel kit, your existing diesel generator runs on natural gas (piped PNG or CNG) together with a small amount of diesel, which is still used to ignite the gas. The engine starts on diesel and gas then replaces a large part of the diesel while it runs. If gas supply stops, the genset carries on running on 100% diesel.

Is a CNG / PNG kit safe for a DG set?

A properly engineered and installed kit is designed to be safe: the gas train includes pressure regulation and automatic shut-off, the electronic control unit only allows gas within safe engine limits, and the genset falls back to diesel automatically. We install as per the gas supplier's requirements and test the system on your site before handover.

What is the price of a dual fuel (duel fuel) kit for a 250 kVA or 500 kVA generator?

The price depends on the genset size (kVA), engine make and model, how many gensets you have and the site work needed for the gas line. That is why we give a firm price after a free site survey. Share your genset details on our quote page and we will send an estimate.

Which generator sizes do you convert?

Diesel generators from 25 kVA to 2500 kVA, including common makes such as Cummins, Kirloskar, Mahindra, Ashok Leyland, Escorts and others. Tell us your make and model and we will confirm.

Can I switch back to diesel?

Yes, at any time. The generator keeps its full diesel system, so it can run on 100% diesel whenever gas is not available.

Is there a warranty?

Yes. CNG Power gives a two-year replacement warranty on the conversion kit parts.

What is the difference between dual fuel and mono fuel conversion?

Dual fuel keeps the diesel system and runs on natural gas plus a small pilot quantity of diesel, with automatic diesel backup. Mono fuel converts the engine to run on 100% gas and involves overhauling the engine, so the generator can no longer run on diesel.

Do I need a PNG connection?

A dual fuel kit needs a natural gas supply. Piped natural gas (PNG) from your area's city gas distribution company is the most convenient. Where a pipeline is not yet available, we can discuss other gas supply options for your site.

Does dual fuel help with CAQM rules in Delhi NCR?

Conversion to dual fuel is one of the routes named in the CAQM directions for DG sets in Delhi NCR. Please confirm the current requirement for your DG set capacity with your State Pollution Control Board or caqm.nic.in.

What is an RECD and do I need one?

An RECD (Retrofit Emission Control Device) is an exhaust after-treatment device that reduces soot from a diesel generator. Whether you need one depends on your genset capacity under the CAQM directions; for the smaller band (19 kW to under 125 kW) the route named is dual fuel mode. See our RECD vs dual fuel comparison.

Is there a government subsidy for converting a DG set?

Eligible micro and small units in Haryana (Faridabad, Gurugram, Sonipat and Jhajjar) and in UP NCR may be able to claim a subsidy. See our Haryana and UP NCR subsidy pages for details. Applying for the subsidy is the customer's responsibility; we help with documents from our side.

How long does the conversion take?

Installation itself usually takes a short time on site once the kit and gas line are ready; the overall timeline depends mainly on gas connection work at your site. We confirm the schedule in the quotation.

Which areas do you serve?

All of Delhi NCR, including Delhi, Noida, Greater Noida, Ghaziabad, Gurugram, Faridabad, Sonipat and nearby industrial areas. Our workshop is in Ghaziabad. For sites outside NCR, please ask.

Next step: request a free quotation, use the savings calculator, or call / WhatsApp +91 93503 24970.

Enquiry Now